Corrosion Coupons
General/Brief Description of task | Install corrosion coupons to various Hot Water Heating (HWH), Glycol, and Chilled Water Systems (CWS) |
Frequency of task performed | April, May, and October |
Hazards Identified | #7 - Noise |
P.P.E. required: Special tools required (if any) |
|
Safe Work Procedure |
|
Download Corrosion Coupons Safe Work Procedures Reference Sheet.pdf