Boiler Servicing

Safe Work Procedure - Boiler Servicing

General/Brief Description of task

Scheduled preventative maintenance of hot water boilers

Frequency of task performed

Boiler #3 - Yearly

Boiler #1 & #2 – Bi-Annually (alternating yearly)

Hazards Identified

Confined Space

P.P.E. required: Special tools required (if any)

  • Safety Glasses
  • 36” Pipe Wrench
  • Dust Mask
  • Rubber Gloves

Safe Work Procedure

  • Visually inspect worksite for possible hazards
  • Ensure proper lockout / tagout of boiler
  • Refer to “Lockout / Tagout Procedures” as found in this section
  • onfined space is a factor when carrying out work inside the boilers. A confined space form needs to be filled out and the necessary precautions taken
  • Refer to “Confined Space Entry” documentation as found in this section
  • Refer to PM #’s M015 / M016–HWH-CP as found in Appendix ‘B’

Download Boiler Servicing Safe Work Procedures Reference Sheet.pdf